Office Air Conditioning Case Studies
![Industrial Air Conditioning Case Study](https://www.celsiusair.co.uk/wp-content/uploads/2019/01/bifold-group-industrial-air-conditioning-case-study-logo.jpg)
Bifold Group
Location: Chadderton, Manchester
Client: Bifold Group
Duration: 12 Weeks
Cost: £125,000
Sector: Office
Description:
Bifold is the leading UK manufacturer of instruments, valves and pumps for the oil and gas sector operating in field where quality control and technical excellence is paramount.
COMPANY X
Location: Chadderton, Manchester
Client: Bifold Group
Duration: 12 Weeks
Cost: £125,000
Sector: Office
![](https://www.celsiusair.co.uk/wp-content/uploads/2018/11/architect-firm-10.jpg)
Our Partners and Networks
![](https://www.celsiusair.co.uk/wp-content/uploads/2018/11/partners-and-networks-strip-002.jpg)